Case Study

Stena Foreteller

Stena Foreteller

Line Boring – Reactive Maintenance

Port Equipment Engineers are often engaged in emergency repairs to ocean going vessels. An example of this was the repair to the Stena Foreteller’s main ramp.

This involved:

Manufacturing new wedges.
Straightening existing units.
Manufacturing & installing new pivot brackets.
Line boring through to ensure newly manufactured pins would align.

Port Equipment has the ability to react swiftly to ensure a vessel does not fall foul to often costly delays.

We can help you too

We're up for the challenge!

Hickman Engineering prides itself on undertaking works that are considered too challenging for other firms. Whether this is a small project or large we offer a set rate 24/7 coverage which is available to all of our clients. Challenge us to come up with your solution.

Other Case Studies: