Case Study

Grimsby Fish Dock – Lock gates

Grimsby Fish Dock – Lock gates

Sluice gate cross head assembly.

Port Engineering Equipment was asked to complete a major manufacture of components for the lock gate infrastructure at Grimsby.

We can help you too

We're up for the challenge!

Hickman Engineering prides itself on undertaking works that are considered too challenging for other firms. Whether this is a small project or large we offer a set rate 24/7 coverage which is available to all of our clients. Challenge us to come up with your solution.

Other Case Studies: