ABP Gottwald Quayside Crane

ABP Gottwald Quayside Crane

Drilling and Boring

Port Equipment Engineering were asked to bore out a defective pin to a depth of 300mm on the jib end of the boom.

We can help you too

We're up for the challenge!

Hickman Engineering prides itself on undertaking works that are considered too challenging for other firms. Whether this is a small project or large we offer a set rate 24/7 coverage which is available to all of our clients. Challenge us to come up with your solution.