Case Study

ABP – Line Boring

ABP – Line Boring

Fork truck mast assembly pivot pin brackets

Port Equipment engineering were asked by ABP to complete the following works:

  • Remove defective pivot pin bearings.
  • Re construct bracket holes with weld.
  • Install & align boring equipment.
  • Line bore both bracket holes & return the holes to their original dimensions.
We can help you too

We're up for the challenge!

Hickman Engineering prides itself on undertaking works that are considered too challenging for other firms. Whether this is a small project or large we offer a set rate 24/7 coverage which is available to all of our clients. Challenge us to come up with your solution.

Other Case Studies: