Case Study

MV Norrland

MV Norrland

Main Engine Repairs

Port Equipment Engineering carried out the following repairs:

  • Removal of defective after cooler & install new unit.
  • Repairs to main engine fuel oil pipework.
  • Cylinder head & piston works carried out.

Work was also carried out on aboard: –

  • Cargo vertical lift.
  • Refurbishment of centrifugal seawater circulating pumps.
  • Coded steel repairs to hull following impact damage.
  • Designed, manufactured & installed new radar scanner mounting brackets.
We can help you too

We're up for the challenge!

Hickman Engineering prides itself on undertaking works that are considered too challenging for other firms. Whether this is a small project or large we offer a set rate 24/7 coverage which is available to all of our clients. Challenge us to come up with your solution.

Other Case Studies: